After roughly 6 weeks of down time, we're finally back in business. The drawer pulls were put on today, finishing the kithcen. (We still have a little more tidying up to do, but the bulk of it is now done!) You can check out Part 1 photos here.
The kitchen - undisturbed
The final product
Kitchen - Pre demolition
The microwave installed
Now with the granite
Kitchen - Pre demolition
Granite installed
Now with the faucet and fridge
The final product
The bedroom and possible colors
Final painted bedroom - we finally painted over the blue-green we hated
The patched bedroom wall
The painted bedroom wall
The shower - sans faucet
The new, higher mounted, shower head
The new faucet, prior to tile patching
The new faucet, with patched tile
Our old water heater
The new tankless water heater, with old plumbing
The new water heater, with new PEX pipe
The utility room
The new lightswitch, roughed into our plaster and cinderblock