The Davis Kitchen Remodel (Part 2) After roughly 6 weeks of down time, we're finally back in business. The drawer pulls were put on today, finishing the kithcen. (We still have a little more tidying up to do, but the bulk of it is now done!) You can check out Part 1 photos here .
The kitchen - undisturbed The final product Kitchen - Pre demolition The microwave installed Now with the granite Kitchen - Pre demolition Granite installed Now with the faucet and fridge The final product The bedroom and possible colors Final painted bedroom - we finally painted over the blue-green we hated The patched bedroom wall The painted bedroom wall The shower - sans faucet The new, higher mounted, shower head The new faucet, prior to tile patching The new faucet, with patched tile Our old water heater The new tankless water heater, with old plumbing The new water heater, with new PEX pipe The utility room The new lightswitch, roughed into our plaster and cinderblock The new in-ceiling speakers Jupirano Antico granite